832-244-0048 vy@matadorlending.com NMLS #1646594  ยท  Matador Lending, Powered by Go Rascal Inc. NMLS #2072896
New construction financing

Building new
in Houston?

New construction is its own discipline. The closing is six to twelve months out, the appraisal happens on a house that doesn't exist yet, the builder has an affiliated lender dangling an incentive, and a standard 45-day rate lock is useless to you. I do this every week, including for buyers in Perry Homes communities across Katy, Cypress, Fulshear, and Richmond.

The core problem
Your rate lock expires
before your house exists
A standard 30–60 day lock cannot cover a 9-month build. Extended lock programs run 90 to 360 days, and most include a one-time float-down if rates fall before you close.
Lock horizon
360 days
Maximum on extended programs
Float-down
Usually 1×
If rates drop before closing
Featured builder relationship

Perry Homes buyers.


Perry Homes has been building in Texas since 1967, and its Houston footprint runs straight through the corridors where most of my volume sits: Bridgeland in Cypress, Jordan Ranch in Fulshear, Candela in Richmond, and the master-planned communities spreading west along the Grand Parkway.

I work these communities constantly. That means I already know how the contracts read, how the construction timelines actually behave versus what the sales sheet says, what the sales counselors need from a lender to hold a lot, and where a file typically gets stuck at month eight.

It also means I know what the builder's incentive is really worth. Which brings us to the part nobody at the design center will bring up.

The thing to know

You are never required to use the builder's lender.

A builder may offer an incentive (closing-cost credits, design center dollars, a rate buydown) for financing through its affiliated lender. That's legal and it's often real money. What no builder can do is require it as a condition of selling you the home.

So the correct move is not loyalty in either direction. It's arithmetic: get the incentive terms in writing, then let both lenders price the same loan and compare the total cost over the years you'll actually own the house.

What I'll hand you

A written side-by-side

  • Note rate and APR, both lenders
  • Discount points and lender credits, itemized
  • The builder incentive, applied where it actually lands
  • Monthly payment with real MUD and Harris County tax rates
  • Total cost at year 5, year 7, and full term
  • Break-even on any buydown, in months

If their offer wins, I'll tell you to take it. That has happened and it will happen again.

Independence notice. Vy Hoang and Matador Lending are not affiliated with, endorsed by, sponsored by, or acting as agents of Perry Homes or any other homebuilder. Builder names appear here only to describe the communities in which clients have been financed. You are never required to use Vy Hoang or Matador Lending to purchase any property, and you are never required to use a builder's affiliated lender to purchase theirs.
The mechanics

Five things that break.

These are the failure points I underwrite around from day one. A loan officer who mostly does resale meets them for the first time at month seven.

Failure point

The rate lock runs out

Nine-month build, sixty-day lock. Extended locks solve it: 90 to 360 days, priced as an upfront fee or a small rate adjustment, usually with one float-down. Which structure is right depends on your build stage and how much certainty is worth to you.

Failure point

Your finances change mid-build

Lenders verify income and assets at funding, not at contract. A job change, a new car loan, a large unsourced deposit, or a credit card opened at the furniture store in month six can undo an approval. I check in through the build so nothing surfaces at week 40.

Failure point

The appraisal comes in short

The appraiser values a house from plans, specs, and closed comps in a community where prices have moved since your contract. Structural options and upgrades don't always appraise dollar for dollar. We plan for the gap before it appears.

Failure point

The MUD tax nobody mentioned

Master-planned communities outside city limits carry Municipal Utility District taxes that can add roughly 0.5 to 1.4 points to your total rate. Two identical homes in adjacent communities can differ by hundreds a month. I price your actual district, not an average.

Failure point

The closing date moves

Weather, inspections, supply, labor: build dates slip. Lock extensions cost money and lock expirations cost more. I keep the lock and the construction schedule tied together and re-forecast rather than discovering the problem at expiration.

Also worth knowing

One-time close construction loans

If you're building custom on your own lot rather than buying a builder's inventory home, a one-time close program funds construction and rolls into permanent financing with a single closing and one set of costs. Different animal, and I place these too.

Build timeline

What happens, and when.

A genuine sequence. Each stage gates the next. Print this and hold your lender to it.

Before you sign

Full underwritten pre-approval

The sales counselor needs this to hold your lot, and you need it to know your real ceiling before you start adding structural options. Underwritten, not a ninety-second pre-qualification.

At contract

Incentive terms in writing, then the comparison

Get the builder's lender offer documented. I price the same loan across the wholesale network and hand you both, itemized, on one page.

Contract to slab

Choose your lock strategy

Lock now with an extended program, or float and lock later. This is a real decision with real cost either way, and it depends on your timeline and your tolerance, not on what's convenient for the lender.

Framing through drywall

Keep the file clean

No new credit, no job changes without telling me, no unsourced deposits. I check in at milestones so nothing surprises underwriting later.

~45 days out

Re-verify and submit

Fresh income and asset documentation, appraisal ordered, full submission to underwriting. This is where a stale file falls apart and a maintained one doesn't.

Final 2 weeks

Walkthrough, clear to close, fund

Conditions cleared, Closing Disclosure at least three business days before you sign, final numbers reconciled against the estimate from month one.

Where I finance new construction

Houston's master-planned corridors.

Communities where clients have financed new construction. Listed to describe coverage only. No affiliation with, or endorsement by, any builder or developer is implied.

Cypress & NW
  • Bridgeland
  • Marvida
  • Dunham Pointe
  • Towne Lake
Katy & Fulshear
  • Jordan Ranch
  • Cross Creek Ranch
  • Elyson
  • Sunterra
  • Fulbrook on Fulshear Creek
Richmond & Sugar Land
  • Candela
  • Harvest Green
  • Aliana
  • Riverstone
  • Sienna
South & North
  • Meridiana
  • Pomona
  • Balmoral
  • Woodson's Reserve
  • Grand Central Park
For builders, sales counselors & agents

A lender who closes.

If you're running a sales office or writing new-construction contracts, what you need from an outside lender is simple: files that actually close, on the date on the contract, without your counselor chasing status.

  • Same-day pre-approval turnarounds so a lot doesn't sit unheld over a weekend.
  • Milestone updates to your team, not just the buyer, with the buyer's written authorization.
  • Extended lock expertise so a slipped completion date doesn't blow up the financing.
  • 150+ wholesale lenders behind every file, including non-QM, so a buyer your affiliated lender declines still has a path to your closing table.
  • Co-branded materials that stay inside RESPA Section 8: everyone pays fair market value for their own share, nothing of value changes hands for referrals.
New construction questions

What builder buyers ask.

Do I have to use the builder's preferred lender at Perry Homes?

No. Federal law (RESPA Section 9) prohibits a seller from requiring you to use a particular title company, and no builder can require you to finance through its affiliated lender. Builders may offer incentives tied to their lender, which is legal, so the honest move is to price both and compare the total cost, not just the closing-cost credit. I put the two side by side in writing so you can see which one actually wins.

How do extended rate locks work on a new build?

A new construction home can be six to twelve months from closing, which is far outside a standard 30 to 60 day lock. Extended lock programs let you lock a rate now for 90 to 360 days, usually for an upfront fee or a slightly higher rate, and most include a one-time float-down if rates drop before you close. Which program fits depends on your build timeline and how much certainty you want to buy.

When should I get pre-approved if my home won't be finished for a year?

Before you sign the builder contract. The builder will ask for a pre-approval to hold the lot, and a full underwritten pre-approval up front means we already know your file works. Then we re-verify income and assets roughly 30 to 45 days before closing, because lenders need current documentation at the time the loan funds.

Can I still get the builder's closing-cost incentive with an outside lender?

Sometimes, and sometimes not. It varies by builder, community, and quarter. Ask the sales counselor to put the incentive terms in writing, then send them to me. If the incentive is large enough that the builder's lender genuinely wins, I will tell you so.

Find out what you qualify for.

A real conversation, a real pre-approval, usually the same day you call. No application fee, no obligation, and no credit pull until you say go.